TA Electrical has been the primary electrical contractor for this industrial waste incineration facility for more than 20 years.
We provide ongoing breakdown support, scheduled maintenance, upgrades, and major project installations including the ORC (Organic Rankine Cycle) waste‑heat-to-power system.
This facility operates in extreme industrial conditions — heat, dust, vibration, corrosive atmosphere — and TA Electrical has installed, repaired, upgraded or maintained almost every electrical system on site since the plant was built.